CWP - Cooper-Weymouth, Peterson *
Equipment & Systems
News
About Us
Contact Us
Formtek
CWP Inventory
CWP Knowledgebase / Tips
FORMTEK
   

KB89: Proper set-up

Category: Miscellaneous Tips | Updated: 6/12/2007 8:26:44 AM | Owner: The Professor | Read: 2972 (Last: 7/24/2014 10:18:47 PM)

Resolution

Remember that 80% of maintenance begins at set up. Make sure your set up personnel are thoroughly familiar with instruction manuals. Correct faulty techniques as soon as noted. Seek out the causes of maintenance problems and correct them before they become more serious.

Related articles
KB90  Minimum pressure
KB91  Audio-visual inspection
KB92  Edge guiding
KB93  Feeding inclined presses
KB94  Using prime material
KB95  Stagger blanking
KB96  Coil-equipped dies
KB97  Control stations
KB98  Continuous running
KB99  Channel iron protectors
KB100  Guarding at installation
KB101  Operator instructions

Was this article helpful?
Votes so far: 51% in 1529
Yes | No

                

Hinckley Road, Clinton ME 04927, (207) 426-2351 FAX: (207) 426-8868
Formtek Logo
*
* EQUIPMENT & SYSTEMS | ABOUT US | CONTACT US | FORMTEK | HOME | SITE MAP    
© Copyright 1998-2007 Formtek-ME. All Rights Reserved.  
Yoder Mfg. Dahlstrom Iowa Precision Hill Engineering Lockformer FMI Dahlstrom Formtek Group Winpro Rowe Machinery B&K Levelers Tishken